Deployment of a Site Master Plan (management of a portfolio four of projects in preparation for the site session)

Industry: Pharmaceuticals / 9-month project / Study of the transfer of a pilot unit for the aseptic distribution of lyophilised cytotoxic vaccines. From the study phase to the DCE.

Our technical scope: Budget of €3,150,000

  • Re-engineering of a 400 m² production area, process fluids and Class C cleanroom,
  • Transfer of equipment (isolator line, freeze dryer, pure steam and PPI water generator, etc.),
  • Creation of a dedicated CO laboratory.

Revamping project for an aseptic vaccine distribution workshop and preparatory areas – Study phase

Our technical scope:

  • Gathering user requirements and conducting technical feasibility studies,
  • Integrating a distribution line under isolators (cytotoxic products),
  • Re-engineering the preparatory areas and laundry facilities. 550 m² ZAC project – Estimated budget: €13.6 million (including distribution line).

Study for the creation of a secondary packaging workshop – Study phase / DCE / Consultation.

Our technical scope:

  • Re-engineering of a storage area and conversion into a packaging area (cytotoxic products),
  • Production area and associated staff facilities, including equipment transfer.